The headquarters of our parent company Bochemie is located in Bohumín, Czech Republic, with the chemical production there being by its nature very energy intensive. The company's management could have simply bought a more efficient boiler, installed some photovoltaics on the roof and called it a day. However, these technologies are expensive, which is why you want to maximize the ROI of your CAPEX, to put it in management speak. In order to achieve this, one has to approach the project holistically, looking at production and other processes in detail from the point of view of energy consumption.
Therefore, in a first step, Bochemie collected as much data as possible and carefully evaluated the findings. Based on this analysis, the company adopted several simple but smart measures that were achievable without complicated financing. After a few years, Bochemie implemented a series of more demanding measures including, but not limited to, a new steam source, high-powered combined heat and power unit, or CHP, and a new central controlling system with remote dispatching. Already these measures have proven key to sustaining the energy crisis of 2022 which, combined with other factors, would have had a much worse impact if left unsolved.